Get In Touch

Tel +64-3-366 4550
Contact >>

Speed Install Competition at Eco Build in London

Monday, 7 March 2011

EnaSolar is pleased to announce the winner of the EnaSolar Inverter Speed Install Competition which was held at the Eco Build show in London's Docklands supported by EnaSolar distributor, H2 Solar Shop of Doncaster, www.h2solar.co.uk

 

The three fastest times over the three day event were 1 minute 48 seconds by Jay Murray, the second fastest was 1 minute 37 seconds by Craig Bellamy and the winning time was by Brook Bellamy at 1 minute and 1 second and yes Brook is Craig's brother. I can see an issue developing here when we run this competition at next years Eco Build, watch this space!

 

Everyone was surprised at how quickly they could change the inverter module and how easy it was to be up and running again. We will ship the inverter to Brook within a few weeks via H2 Solar Shop in Doncaster who will make sure Brook has all the components needed to get it up and running.

 

Enasolar run the speed install competition at every major event where we partnership with our distributors. Keep an eye on our website to see where you can have a go. http://www.enasolar.net/install

 

The top ten fastest times annually go in a draw to visit our factory in New Zealand.

 

Save time, save money and save the planet! Use Enasolar Inverters.

rss
© 2012 EnaSolar Ltd.
Tel +64-3-366 4550 | 66 Treffers Road, Christchurch 8042, New Zealand